Cost Guide

Bathroom Remodel Material Checklist

A room by room material checklist for a bathroom remodel: tile, backer board, waterproofing, fixtures, vanity, lighting and the small parts everyone forgets, with quantities and cost ranges.

Last updated October 23, 2026. All prices are US ranges checked in October 2026 against published national cost surveys and home center pricing. Your local quotes will vary.

Prices checked October 2026 Free calculator included

Run your own numbers: this guide pairs with our free Tile Calculator. It gives you exact material quantities for your measurements in about ten seconds, using the same rates this guide explains.

Why a Checklist, and What a Bathroom Costs in October 2026

A mid range bathroom remodel in the US runs about $70 to $250 per square foot all in, or roughly $8,000 to $25,000 for a standard 40 square foot bathroom in October 2026, based on published Angi and HomeAdvisor remodel cost data. Materials are typically 40 to 50 percent of that. The problem is never the big items: everyone remembers tile and a vanity. The problem is the forty small items around them, because a bathroom packs plumbing, electrical, waterproofing and finishes into the smallest room in the house, and every trade needs parts the others forgot. This checklist walks the room system by system, with quantities for a standard 5 by 8 foot bathroom with a tub shower, so you can build a shopping list and a budget that do not collapse on day three.

Tile, Backer and Waterproofing

ItemQuantity for a 5x8 bathOctober 2026 cost
Wall tile, tub surround (about 80 sq ft)88 to 95 sq ft with waste$2 to $8 per sq ft, $175 to $760
Floor tile (40 sq ft)44 to 46 sq ft with waste$2 to $10 per sq ft, $90 to $460
Cement backer board, 1/2 inch6 to 8 sheets, 3x5 ft$12 to $18 per sheet
Waterproofing membrane or liquid1 kit or 1 gallon plus tape and corners$150 to $450 total
Thinset mortar, modified2 to 3 bags, 50 lb$18 to $35 per bag
Grout1 to 2 bags or boxes$15 to $40
Tile edge trim (Schluter type)3 to 5 sticks, 8 ft$15 to $30 per stick
Shower niche, prefab1$50 to $120
Caulk, silicone, color matched2 tubes$10 to $16 per tube
Backer screws and seam tape1 box each$25 to $45 combined

The math behind the tile rows is simple: measure each surface, add 10 percent for cuts, more for diagonal layouts. Our Tile Calculator and Grout Calculator do it precisely for your room, including the way small tiles multiply grout consumption. Do not guess these two numbers: tile shortages mid job risk dye lot changes, and grout shortages risk a color shift exactly where the eye lands.

Plumbing Fixtures and Rough Parts

ItemBudget rangeMid range
Tub or shower base$250 to $600$600 to $1,500
Shower valve and trim kit$120 to $300$300 to $700
Toilet$150 to $300$300 to $700
Vanity with top, 30 to 48 inch$300 to $700$700 to $1,800
Faucet$60 to $150$150 to $400
Wax ring, supply lines, angle stops$25 to $60 totalSame. Buy new, always
Drain assemblies and P traps$40 to $120$120 to $250 in metal finishes
Shower door or curtain rod$30 curtain setup$400 to $1,200 glass door

Two rules save real money here. First, keep plumbing in its existing locations unless the layout truly fails: moving a drain or supply line adds $500 to $2,000 per fixture in labor and patching. Second, buy the valve and trim from the same brand and series. Shower valves are brand specific behind the wall, and the pretty trim kit from another line will not fit the rough valve your plumber installed.

The Rest of the Room

  • Exhaust fan: $100 to $400, sized at least 1 CFM per square foot, vented outside. This is a moisture control device, not a luxury, and it protects everything else on this list.
  • Lighting: vanity light $80 to $400, plus a damp rated ceiling or shower light $40 to $150. Put them on separate switches if the budget allows.
  • Mirror or medicine cabinet: $80 to $600. Recessed cabinets need the wall opened between studs, so decide before drywall closes.
  • Paint: one gallon of bathroom rated paint, $40 to $70, plus primer for new drywall. Ceiling paint too, while the room is empty.
  • Drywall and patch materials: 2 to 4 sheets for a gut job at $12 to $18 each, joint compound, tape and corner bead $40 to $80.
  • Flooring underlayment: uncoupling membrane for tile floors, $1.50 to $2.50 per square foot, or cement board if the budget is tight.
  • Hardware: towel bars, toilet paper holder, robe hook, $60 to $250 the set. Buy them with the faucets so finishes match exactly.
  • Access panels and shut offs: $15 to $40, and the cheapest future repair insurance in the building.

DIY Versus Pro: Where Homeowners Save Safely

Demolition is the great DIY savings in a bathroom: a careful homeowner with a dumpster can remove a standard bath in a weekend and save $500 to $1,500, keeping the plumbing capped by a plumber for an hour of labor if needed. Painting, mirror and hardware installation, and vanity setting on existing plumbing are also safe homeowner work. Tile setting is learnable and many first bathrooms come out well, but it is slow, and the waterproofing beneath it must be right, because that layer cannot be inspected once tile covers it. Plumbing moves, electrical work and glass door installation belong to licensed pros in most jurisdictions, for code and insurance reasons as much as skill. A realistic hybrid budget: homeowner does demo, paint and trim out, pros do rough in, waterproofing and tile, saving roughly a quarter of the labor bill without gambling on the layers that flood houses.

Sequence: Buy in This Order

Order long lead items first: vanity, tile, fixtures and glass are commonly 1 to 6 weeks out, and a remodel should never start demo until everything is on site or confirmed in a local warehouse. Check every tile box for the same lot number when it arrives, open one box of each fixture to confirm finish and completeness, and store the valve boxes where the plumber will find them on rough in day. Keep receipts and one extra box of each tile: returns of full boxes are easy within the window, and the spare box becomes priceless in year four when a single tile cracks. Run the quantities through the calculators linked above as you finalize each line, and your checklist becomes a budget, line by line, that a contractor can quote against directly.

Turning the Checklist Into a Budget Number

To turn this checklist into a working budget, price it in three passes. Pass one is the wet work: tile, backer, membrane, thinset, grout and trim from the first table, which for a standard bath totals roughly $700 to $2,200 depending on tile taste. Pass two is fixtures, from the second table, roughly $900 to $4,800 across the budget to mid range columns, with the vanity and shower glass doing most of the swinging. Pass three is the room itself: fan, lighting, mirror, paint, drywall and hardware, roughly $500 to $1,600. Add the three passes, then add 15 percent as a contingency you are not allowed to spend on upgrades in week one, because it belongs to whatever the walls are hiding: the rotted subfloor at the tub edge, the galvanized pipe that crumbles when touched, the junction box buried since 1974. Remodelers who open walls for a living will tell you the contingency is not pessimism, it is the most consistently accurate line in the whole estimate. Whatever is left at the end buys the good towels.

Frequently Asked Questions

How much tile do I need for a standard tub shower surround?

A typical alcove tub surround has about 70 to 85 square feet of wall: three walls, roughly 8 feet high, minus the tub face. Order 90 to 95 square feet of tile to cover cuts and waste. The floor of a standard 5 by 8 bathroom is 40 square feet, so order 44 to 46. Run your own walls through the tile calculator with your real measurements, because ceiling height and a taller shower build change the number fast.

What is the most commonly forgotten bathroom material?

The unglamorous waterproofing and transition parts: membrane corners and pipe seals, a shower niche, edge trim for every exposed tile edge, the toilet wax ring and new supply line, and a flange extender when the finished floor rises above the old one. Each costs a few dollars and each can stall a job for a day when missing. The checklist in this guide exists because every remodeler has a story about a Saturday lost to a four dollar part.

Can I skip the waterproofing membrane to save money?

That is the most expensive money you can save. Tile and grout are not waterproof; water passes through grout joints and soaks whatever sits behind the tile. A membrane system for a tub surround costs about $150 to $450 in materials and protects studs, subfloor and the ceiling below for decades. Mold remediation and rot repair start in the thousands. Waterproof the wet walls properly, and save money on the tile itself instead.

How much should I budget for fixtures versus tile and materials?

On a mid range remodel, a common split is roughly a third fixtures and fittings (tub or shower, toilet, vanity, faucets), a third tile, backer and waterproofing systems, and a third everything else: lighting, exhaust, paint, glass, mirrors and hardware. Luxury taste moves the fixture share up fast, because a single designer faucet set can cost as much as the entire tile order for a small bath.

Should I buy materials myself or let the contractor supply them?

Split it. Homeowners usually get better prices and exact choices on visible retail goods: tile, vanity, fixtures, mirror and lighting, especially watching sales. Contractors get better pricing and, more importantly, warranty coverage on rough materials: backer board, membrane, thinset, pipe and fittings. Agree in writing who buys what before demo day, because a tile the contractor has never installed can become an argument about labor rates.

More Cost Guides

Estimates only: the prices in this guide are planning ranges based on national data, not quotes. Material prices move, regions differ, and every house hides surprises. Get two or three written local quotes before you commit, and see our full Disclaimer.