Estimate hot mix asphalt tonnage and installed cost for a driveway or patch from area and thickness.

Last updated October 23, 2026. Every result below shows the formula behind it, so you can double check the math.

Formula shown Worked example included Free to use

Asphalt Tonnage Estimator

Enter the paved area and the compacted thickness. Results give the hot mix tonnage a contractor would order, plus material and installed ranges.

ft
ft

Your Estimate

0 tons of hot mix
Paved area-
Mix volume-
Hot mix material cost-
Typical installed range-

Installed range uses $5 to $9 per square foot for new asphalt on a prepared base, October 2026. Hot mix at $90 to $140 per ton at the plant. Full new base work prices higher; see the cost guide.

The Formula Behind This Calculator

Volume (cubic feet) = length (ft) x width (ft) x thickness (in) / 12

Weight (tons) = volume x 145 lb per cu ft / 2,000

Rule of thumb check: 1 square yard at 1 inch thick takes about 110 lb of mix

Compacted hot mix asphalt weighs about 145 pounds per cubic foot, and the industry cross check agrees: a square yard one inch thick is 0.75 cubic feet, which at 145 pounds is about 110 pounds, the number on every paver operator's pocket chart. Enter compacted thickness, not loose thickness: crews lay the mat roughly a quarter thicker loose because the rollers compress it to spec, and the tonnage is bought against the compacted result you are paying for.

Worked Example: A 12 by 40 Driveway at 3 Inches

A standard single width driveway, 12 feet wide by 40 feet long, resurfaced in place at 3 inches compacted over its prepared base.

  1. Area: 12 x 40 = 480 square feet.
  2. Volume: 480 x 3 / 12 = 120 cubic feet.
  3. Weight: 120 x 145 = 17,400 pounds.
  4. Tonnage: 17,400 / 2,000 = 8.7 tons of hot mix.
  5. Material budget: 8.7 tons at $90 to $140 = about $783 to $1,218 at the plant.
  6. Installed budget: 480 square feet at $5 to $9 = $2,400 to $4,320 for the paving work on a sound base.

Notice the distance between the material line and the installed line: trucking at temperature, the paver and rollers, and a crew that can lay 9 tons before it cools are what the difference buys. When you compare quotes, line their stated tonnage up against the 8.7 tons this job truly needs. A 6 ton quote at 3 inches is not a bargain; it is a 2 inch driveway wearing a 3 inch label. Our asphalt driveway cost guide walks through reading a full quote.

A Complete Guide to Asphalt Quantities

Asphalt is the only material on this site you almost certainly will not install yourself, and its calculator exists for a different reason: verification. Tonnage is the unit paving is bought, bid and delivered in, and a homeowner who can compute it independently can read any quote like an inspector. This guide covers the density math, thickness judgment, and the base questions that decide whether the mat you buy is the mat you keep.

Compacted Versus Loose Thickness

Quotes promise compacted thickness because that is the driveway you drive on. The paver lays mix about 25 percent thicker than the target and the rollers bring it down, squeezing out air until the mat reaches density. Density is not a detail: mix compacted to 92 to 96 percent of its maximum density sheds water and resists rutting, while under compacted mix drinks water, oxidizes fast and ravels at the surface. When a quote seems to promise your thickness at two thirds of your tonnage, one of the numbers is fiction, and it is rarely the tonnage they plan to buy. Ask for both figures in writing, then check them here.

The Base Carries the Load

Asphalt is a flexible surface: it spreads loads onto the aggregate base beneath, and the base spreads them onto the soil. That chain means a 3 inch mat over 6 inches of compacted crusher run outperforms 4 inches of mat over dirt in every way that matters by year five. For new work, expect quotes to specify base depth, compaction, and edge support, because unsupported edges are where driveways unravel first. For overlays, the honest question is whether the existing structure deserves a new wearing surface: widespread alligator cracking, rutting and standing water are base confessions, and paving over them rents a new surface for two seasons at full price.

Overlays, Patching and Cold Mix

Not every asphalt number is a new driveway. Overlays at 1.5 to 2 inches compacted use proportionally less tonnage: run this calculator at 2 inches for a fair estimate. Patches and apron repairs are usually priced per visit rather than per ton, because minimums rule small work. Cold patch in 50 pound bags covers about 2.5 square feet at 2 inches per bag and is a legitimate temporary fix for potholes while you plan real work; it is not a paving material and does not pretend otherwise on any honest label. Sealcoating, finally, is maintenance by area, not tonnage: a squeegee applied protective coat every 2 to 3 years, priced around $0.25 to $0.45 per square foot professionally in 2026.

Timing, Temperature and Season

Hot mix must be placed and compacted hot, which makes paving a seasonal trade in cold states: plants shut down in winter, and late season quotes sometimes discount to fill the last weeks. In hot climates the constraint flips; summer demand and afternoon storms drive scheduling. Either way, a contractor who will pave your driveway in marginal weather at a suspicious discount is telling you how the mat will perform. Take the number from this page, take three quotes in the proper season, and let the tonnage column arbitrate.

Before You Sign: Five Questions for Any Paver

One, what compacted thickness are you quoting, in writing? Two, how many tons does that come to on my measured area, and does it match this calculator within a normal overrun? Three, what base work is included: depth, material, compaction, and what happens if the crew finds failed base mid job, at what price? Four, who handles edge support and the tie in at the street apron and garage slab, the two joints where driveways separate first? Five, what is the sealcoating guidance and first year follow up if a soft spot appears? A contractor who answers all five concretely has nothing to hide behind the tonnage. A contractor who answers none of them has given you the most useful information of all, early, while your deposit is still in your pocket. Keep the written answers with the contract; verbal tonnage has a way of compacting further than the mat does.

Frequently Asked Questions

How many tons of asphalt do I need for a 12 by 40 driveway?

At the standard 3 inch compacted thickness, a 12 by 40 foot driveway (480 square feet) needs 120 cubic feet of mix, which at 145 pounds per cubic foot is 17,400 pounds, or 8.7 tons. At 2 inches it needs about 5.8 tons and at 4 inches about 11.6 tons. Paving contractors order to this same math, plus a small overrun, so a quote whose tonnage is far from your calculator result is a quote to question politely.

What thickness should a residential asphalt driveway be?

Two inches of compacted hot mix is the minimum seen on budget overlays, 3 inches is the residential standard worth paying for, and 4 inches suits heavy vehicles or weak soils. The base matters as much as the mat: 4 to 8 inches of compacted aggregate under the asphalt carries the load, and a thick mat over a failed base still fails. Ask quotes to state compacted thickness and base depth as separate numbers.

How much does hot mix asphalt cost per ton in 2026?

Hot mix at the plant runs roughly $90 to $140 per ton in most US markets in October 2026, tracking oil prices and haul distance. That is material only: a ton of mix spread and compacted as a driveway costs several times its plant price once trucking, the paver, rollers and crew are counted, which is why installed driveway pricing of $5 to $9 per square foot at 3 inches is consistent with $100ish tons. Our full cost guide breaks the installed numbers down.

Can I buy hot mix and pave a driveway myself?

Plants will sell hot mix to anyone with a truck, but paving is a race against cooling: mix placed below compaction temperature never reaches density and ravels within a season. Without a paver box and a multi ton roller, a driveway sized job almost always ends as an expensive patch. Homeowner scale asphalt work that does make sense: cold patch repairs, which come in bags and set by compaction, and sealcoating, which is a maintenance task with a squeegee, not a paving task.

How long does a new asphalt driveway last?

A properly based 3 inch driveway lasts 15 to 25 years with sealcoating every 2 to 3 years and prompt crack filling. The surface can then be milled or overlaid at roughly half the original cost to reset the clock. The killers are a thin base, standing water, unsealed oxidation and edges without support where tires drop off. Longevity is decided by base and drainage more than by the top inch of mix.